Business Intelligence setup in 1 hour.
Quick business intelligence in 60 minute. In 12 setup business intelligence and prepare reports, Dashboard. Ryndata BI engine setup everything in 1 hour. Preview reports without having SQL skills.
Manish Kumar
Step 1: Set SQL database server name and database as target data warehouse system.
Step 2: Data Modelling
Step 3 : Setup Fact (Measure) Tables and Formula .
Step 4: OLAP Cube Setup
Step 5: Setup ETL data
Step 6: System Design and configuration
Step 7: DW and OLAP Infrastructure settings update
Step 8: Quick Data preparation, adjustment and control using Ryn Data EXCEL Addins.
Step 9: Deploy Cube Schema.
Step 10: Check SQL Server Cube generation. Verify that new cube has been created successfully
Step 11: In Excel Connect Oalp server and verify loaded data. Make sure loaded data from source using ETL is same in Cube.
Step 12: Prepare Excel pivot and publish workbook to central server. Open workbook and make sure report structure did not lost.
For Information in details follow here